Home

Now selling | 40 storeys, 571 suites | HST relief window to March 31, 2027 +1-647-381-4000 WhatsApp UB Realty Inc., Brokerage | independent of the builder
Rendering of the 40-storey 1515 Pickering Parkway tower beside Highway 401 in downtown Pickering, with Lake Ontario beyond
Downtown Pickering | Pre-construction condos

1515 Pickering Parkway Condos

A 40-storey tower by Sevoy Developments, a 3-minute walk to The Shops at Pickering City Centre and 5 minutes to the GO Bridge. Studio to 2 bed + den. Prices on request.

Show my matches
*Subject to eligibility; not tax advice. Artist's concept. E.&O.E.
  • 40 storeys | 571 suitesStudio to 2 bed + den
  • Architecture by ArcadisBlack-and-white "piano key" facade
  • Interiors by Truong Ly DesignLandscape by The MBTW Group
  • 12,000+ sq ft of amenitiesGround, level 2 and level 5
  • Sevoy Developments3,400+ suites in planned development

The numbers that matter before you sign

Deposit and pricing details →
$130KMax HST reliefAgreements April 1, 2026 to March 31, 2027, homes up to $1.5M, subject to eligibility
15%Deposit before occupancySpread over years, plus 5% on occupancy [confirm current schedule]
2030Estimated occupancyTime to save and plan the rest
17Floor plansStudio to 2 bed + den, 341 to 700 sq ft total

Deposit: builder fact sheet. HST: Ontario Bill 114 (Royal Assent May 12, 2026) and the federal rebate; general information only, confirm eligibility with your lawyer.

Rendering of the glass podium and lobby entrance of 1515 Pickering Parkway at street level
The design

A tower that reads like a keyboard.

Arcadis drew the facade in alternating black and white bands, a nod to piano keys, over a glass podium with the lobby, lounge and fitness centre at street level. Inside, Truong Ly Design pairs warm wood with stone and a two-sided fireplace in the lounge.

Inside the amenities →
Watch

Walk the plans with us in 15 minutes

Book a private video call. We share the screen, go through the plans that fit your budget and purpose, and show how the 2026 HST relief and deposit schedule work for you.

Project film: [add the builder's video URL when available]

Over 12,000 sq ft of amenities on three levels

Every amenity →
Double-height fitness centre with floor-to-ceiling windows
Fitness centre
Family room with billiards, foosball and a big screen
Family room
Party room with fireplace and lounge seating
Party room
Coworking lounge with booths and work tables
Coworking
Library with a long table and shelving
Library

Also on level 5: outdoor terrace, pet spa and playground, bike repair and workshop, contemplation room. Artist's concepts. E.&O.E.

3 minutes to the mall, 5 to the GO, 35 to Union

Full neighbourhood guide →
Monochrome map of downtown Pickering showing 1515 Pickering Parkway at Pickering Parkway and Valley Farm Road, beside Highway 401 and the Pickering GO station, with Frenchman's Bay to the south 1515 Pickering Parkway

Nearby

Showing 53 nearby places
  • The Shops at Pickering City CentreShopping 3 min walk
  • H&MShopping
  • Saks OFF 5THShopping
  • WinnersShopping
  • HomeSenseShopping
  • Canadian TireShopping
  • Walmart SupercentreShopping
  • Farm BoyGrocery 4 min walk
  • Pacific Fresh Food MarketGrocery
  • Chuuk Mexican Kitchen and BarDining
  • PORTDining
  • State & MainDining
  • Pickle BarrelDining
  • Mandarin RestaurantDining
  • AmiciDining
  • MakimonoDining
  • The Ridges PubDining
  • Zeera By The BayDining
  • Moxies PickeringDining
  • Jack Astor's Bar & GrillDining
  • The Owl of MinervaDining
  • Mansion Kitchen + BarDining
  • Hibachi GrillDining
  • Namak HandiDining
  • The Sailing Restaurant and BarDining
  • Durham Live (casino resort, The Arena)Entertainment 4 min drive
  • Cineplex Cinemas and VIPEntertainment
  • Pickering Public LibraryEntertainment 4 min walk
  • Esplanade ParkParks & Recreation 3 min walk
  • Diana Princess of Wales ParkParks & Recreation 3 min walk
  • Pickering Recreation ComplexParks & Recreation 3 min walk
  • Frenchman's BayParks & Recreation
  • Beachfront ParkParks & Recreation
  • David Farr ParkParks & Recreation
  • Valley Farm RavineParks & Recreation
  • Bay Ridges Kinsmen ParkParks & Recreation
  • Douglas RavineParks & Recreation
  • Balsdon Dog ParkParks & Recreation
  • Pickering Soccer CentreParks & Recreation
  • KHEL (badminton, volleyball, pickleball)Parks & Recreation
  • Kings Courts PickeringParks & Recreation
  • Pickering GO (GO Bridge)Transit 5 min walk
  • Highway 401Transit Next door
  • Future Durham-Scarborough BRTTransit 8 min
  • Union Station by GO trainTransit 35 min
  • Bayview Heights Public SchoolSchools
  • Maple Ridge Public SchoolSchools
  • Biidaasige Mandamin Public SchoolSchools
  • Vaughan Willard Public SchoolSchools
  • University of Toronto ScarboroughSchools 12 min
  • Centennial CollegeSchools 15 min
  • Ontario Tech UniversitySchools 20 min
  • Durham CollegeSchools 20 min
Places and times from the builder brochure. Live map on the website.
Why Pickering, why now

A downtown being built around you

The Pickering market guide →
6,000homes planned in the 55-acre Pickering City Centre next door
36 kmDurham-Scarborough rapid bus corridor through Pickering
9.8%Durham population growth since 2019, fastest of the 905 regions
460Knew jobs projected in Durham by 2051

Sources: RENX (Oct 2025), Region of Durham, builder brochure citing Statistics Canada and Durham.ca. Projections, not guarantees.

Quick answers

All questions →
Where is 1515 Pickering Parkway?

In downtown Pickering, Ontario, at Pickering Parkway and Valley Farm Road: a 3-minute walk to The Shops at Pickering City Centre and a 5-minute walk to the GO Bridge, with Highway 401 beside the site.

How much are suites at 1515 Pickering Parkway?

Prices change as suites sell, so we send the current price list and availability on request, usually the same business day. Request prices.

When is occupancy, and what is the deposit?

Estimated occupancy is 2030. The builder fact sheet shows 15% paid before occupancy in 5% instalments and 5% on occupancy; ask us for the schedule that applies to new agreements today.

Who is the builder?

Sevoy Developments, with architecture by Arcadis, interiors by Truong Ly Design and landscape by The MBTW Group. UB Realty Inc., Brokerage is an independent brokerage representing buyers.

Free buyer package | sent in minutes

Get the complete 1515 Pickering Parkway buyer package

  • ✓Current price list and available suites
  • ✓All 17 floor plans in one PDF
  • ✓Deposit schedule and incentive sheet
  • ✓2026 HST relief check and closing-cost estimate
  • ✓Pickering rent comparables for investors
Takes 20 seconds | no obligation
Are you working with a real estate agent?
Send me the buyer package Your details go to UB Realty only, never to the builder or third parties. If you already work with an agent, tell us and we will respect that relationship.